Launch training module
Rise-style, mobile-first course: the station, the six-step build, hold rules, allergens, and a guest conversation.
Take the module → 2 · Reference🧾Build sheet laminate
Glaze-station laminate with English, Español, and bilingual views. Prints at 11 × 8.5.
View the laminate → 3 · Certify✅Practical build check
Observer checklist for operators and field coaches, with critical standards and an automatic pass rule.
Try the checklist → 4 · Roll out🗓️Absorb rollout plan
Enrollment rules, curriculum and certificate setup, notifications, timeline, reporting, risks, and handoff.
Read the plan →The brief
Launch an 8-week limited-time item across every location on the same day. Most stores are run by independent operators, and the line staff is high-turnover and partly Spanish-speaking. Culinary had a recipe card. Ops needed every team member able to build it to spec, safely, before day one, and needed proof they could.
Design decisions
- One rule up front: "glaze to order" protects quality and cuts waste, so every piece of the kit reinforces it.
- The laminate does the remembering. The module teaches why; the laminate at the station covers the specs, so nobody has to memorize pump counts.
- Certification is observed, not quizzed. A short online check gates the practical build check, and the practical check is what certifies.
- Field and operators go first. They're certified and calibrated before they certify their teams.
What this kit demonstrates
| Translating a new product into a complete learning plan | Module, laminate, assessment, certification, comms timeline |
| Onboarding and certification | Role-based paths and an observed practical check with approval |
| LMS administration | Absorb enrollment rules, task approvals, certificates, notifications, reports |
| Content localization | Single-source bilingual laminate; translation and review workflow |
| Print and job aids | Print-ready 11 × 8.5 laminate built from an editable template |
| Project management | Six-week timeline, risk log, weekly status, handoff package |
| Measurement | Certification, audit, waste, and feedback targets |